Work order

A work order is the written scope for one field job: the task, site, access, timing, limits and proof of completion, agreed before an engineer is booked and used afterwards to confirm the work was done.

Also known as: Field work order, Job order, Service order

What is Work order?

A work order turns a request into something an engineer can carry out without guessing. It names the site and the contact, lists each task in order, says what must not be touched, and states how the result will be shown. The customer approves it before anyone is booked, so both sides work from the same page.

A good work order has a few standard parts: the site address and a local contact; the access details, such as hours, badges and escorts; the tasks, one action per line, with the expected result; the limits, including systems that are out of scope; the timing and any change window; and the evidence to be returned, such as photos, test results or a written note. For remote hands, each line is a single physical action that can be done and checked.

A work order differs from a ticket, a statement of work and a closeout report. A ticket records a request and its status. A statement of work covers a whole engagement, which may include many visits. A work order covers one visit or one job, and the closeout report is the record sent back when it is done. Formats vary between providers, so agree the fields in advance.

How it shows up in practice

  • Write one action per line, with the expected result beside it, so the engineer can tick each line off.
  • State what must not be touched. A short do-not-touch list prevents most avoidable mistakes on production equipment.
  • Name the access route and a local contact who can open doors on the day, with a backup.
  • Say what evidence comes back, for example photos of the rack before and after, and agree the sign-off step.
  • Change the work order in writing if the scope changes on site, and record who approved the change.

QUESTIONS

Common questions.

What should a work order include?
Include the site and contact, access details, the tasks one action per line with expected results, the limits and out of scope items, the timing, and the evidence to be returned. Add a sign-off line so completion is confirmed in writing.
What is the difference between a work order and a closeout report?
The work order is agreed before the job and says what will be done. The closeout report is delivered after the job and shows what was done, with photos, test results and open items. Together they bracket one visit.

Get started

Need engineers on site? Tell us where.

Tell us the sites, the scope and the timeline. We reply with a written plan.

Go to

Saved and recent pages stay on this device. Press ? for keyboard shortcuts.

Keyboard shortcuts

Search the site
/ or Ctrl K
Show this list
?
Switch light, dark or system theme
t
Save or unsave this page
s
Go to the home page
g then h
Go to services
g then s
Go to coverage
g then c
Go to the contact form
g then q

Shortcuts are off while you type in a field.