Get cabling, Wi-Fi and devices ready at the new office before staff arrive, then cut over on a planned weekend.

Quick answer

What is the answer?

Plan the IT side of an office relocation as a project with a written scope, a survey of both sites and a staged destination. Cable and test the new space first, survey the Wi-Fi, then move devices over a planned cutover weekend with a checked handover. Retire old equipment securely and close out with a report.

WHAT IT LOOKS LIKE

The situation.

The lease dates are fixed. The new office is being fitted out by people who do not think about IT until late. Meanwhile your staff expect to leave on Friday and work normally on Monday, with working Wi-Fi, desk phones, printers and access to the same files.

IT work is sequenced behind the building work. Cable runs cannot be tested before the walls are closed, and the network cannot go live before the ISP circuit is delivered. Every delay upstream shrinks your window, and the cutover weekend does not move.

The way to avoid a bad Monday is to treat the move as a program. Survey both sites, build the destination ahead of time, and rehearse what happens on the day. Nobody should discover on Saturday that a rack has no power or an access point has no cable.

What goes wrong when it is handled badly

  • Cabling is installed to the wrong specification or left untested, and faults appear after staff arrive.
  • Wi-Fi is designed from floor plans alone, then shows dead zones once the furniture is in.
  • The asset list is out of date, so equipment is lost, left behind or moved without a record.
  • The destination is not ready when the move starts, and staff cannot work.
  • Network and ISP dependencies are discovered on the cutover weekend.
  • Old equipment is dumped with data still on it and no proof of what happened.

HOW WE HANDLE IT

How we approach it.

  1. STEP 01

    Survey both sites and write the scope

    We walk the current and new offices and list what moves, what is replaced and what is retired. The written scope fixes tasks, dates, dependencies and exclusions.

  2. STEP 02

    Plan the move and reconcile the asset register

    Equipment is listed with tags and destinations. We agree building access, lift and dock bookings, and who signs for what at each end.

  3. STEP 03

    Stage the destination before anyone arrives

    Cabling is installed and certified, and Wi-Fi is checked with a survey after install. Racks, switches and desks are ready before the move.

  4. STEP 04

    Cut over on a planned weekend

    Engineers move and connect devices to a written checklist, and test each area. Your team confirms services from its own tools before staff return.

  5. STEP 05

    Retire old equipment and close out

    Leftover equipment is collected under a recorded chain of custody and disposed of to the standard you set. You receive photos, test results and a closeout report.

What you receive

  • A written move plan with schedule, dependencies and named contacts
  • A reconciled asset register with tags and destinations
  • Cabling test results for the new space
  • A Wi-Fi survey report for the new floor plan
  • A cutover checklist and the signed handover for each area
  • A closeout report with photos and a disposal record

Services that apply

Related case studies

Case studies are representative scenarios, not client projects.

QUESTIONS

Common questions.

What does the IT side of an office move include?
It covers surveys of both sites, structured cabling, Wi-Fi design and validation, network and ISP readiness, device moves, a cutover weekend and secure disposal of retired equipment. Each part is written into one scope with dates and owners.
How early should we start planning?
As soon as the lease and fit-out dates are known. Cabling, circuits and equipment have lead times, and the IT work depends on the building work. The earlier the scope is written, the more of it can be staged before the move.
Do you cable the new office before the move?
Yes, if the scope includes it. Cabling is best installed and tested during or right after fit-out, so the destination is ready when the move starts. Timing depends on how far the building work has progressed.
Can the move happen over a weekend?
Often, if the destination is staged and the cutover is rehearsed on paper. The plan names who does what and when. Whether a weekend is realistic depends on the size of the office and your dependencies.
What happens to the old equipment?
Equipment that is not moving is collected under a recorded chain of custody. Data sanitization and disposal follow the standard you choose, and the record is included in the closeout report.

Get started

Need engineers on site? Tell us where.

Tell us the sites, the scope and the timeline. We reply with a written plan.

Go to

Saved and recent pages stay on this device. Press ? for keyboard shortcuts.

Keyboard shortcuts

Search the site
/ or Ctrl K
Show this list
?
Switch light, dark or system theme
t
Save or unsave this page
s
Go to the home page
g then h
Go to services
g then s
Go to coverage
g then c
Go to the contact form
g then q

Shortcuts are off while you type in a field.