IMAC & Projects · Deliverable
IMAC Asset Register and CMDB Updates.
Asset register updates reflecting every install, move, add, change, or disposal
Part of IMAC & Projects. Last reviewed October 2026.
Quick answer
What is IMAC Asset Register and CMDB Updates?
An IMAC asset register update is the record change made after each install, move, add, change, or disposal so your inventory matches what is physically in the building. Deploris engineers capture serial numbers, asset tags, location, and lifecycle status at the device, and deliver the corrected records in your agreed format.
WHAT THE WORK COVERS
What IMAC Asset Register and CMDB Updates includes.
- 01Serial number and asset tag capture by scan or photo at the device, matched against the existing register entry
- 02Full location hierarchy per asset: site, building, floor, room, desk or rack unit, and patch panel port where relevant
- 03Lifecycle status transitions such as in stock, deployed, in repair, retired, and disposed
- 04User or owner assignment and cost center changes when a device moves between people or teams
- 05Component-level changes such as added RAM, a replaced SSD, or a new dock, linked to the parent configuration item
- 06CMDB relationship corrections, for example device to switch port or monitor to workstation
- 07Reconciliation exceptions flagged for review: untagged devices, duplicate serials, and assets found that are not in the register
HOW WE DELIVER IT
How it is delivered.
- 1
Agree the data model
We confirm which fields, status values, and tagging conventions your register uses, plus whether updates go in as a structured file or directly into your asset tool under the access you grant.
- 2
Capture at the device
The engineer records serial, tag, location, and status while the asset is in hand, using a consistent template so data is not re-keyed from memory later.
- 3
Validate and reconcile
The engagement manager checks each record against the existing register, resolves duplicates and mismatches where possible, and lists anything that needs a decision from your asset owner.
- 4
Deliver and confirm
Corrected records are delivered with a before and after change log. Your asset owner confirms receipt, and open exceptions stay tracked until closed.
INPUTS AND OUTPUTS
What you provide and what you receive.
You provide
- A current register export, or read and write access to your asset management tool or CMDB if direct updates are agreed
- Your field schema, mandatory fields, and status taxonomy
- Your asset tagging convention and any label stock for new devices
- A named data owner who resolves mismatches and approves exceptions
You receive
- A before and after change log linked to each work order
- A reconciled register export or direct record updates in the agreed format
- A list of exceptions: untagged, duplicate, missing, and unexpected assets with locations
- Photos of asset tags and serial labels attached to the relevant records
WHEN IT FITS
When this is the right deliverable.
Your last audit found that a large share of desks hold devices that the register places elsewhere, and you want every future move to correct the record.
A CMDB owner needs each hardware change linked to the right configuration item so change and incident records stay trustworthy.
A finance or procurement team needs retired devices marked disposed with a date, so depreciation and licensing counts stop including them.
WHERE WE DELIVER
Delivered in 75+ metros across 11 countries.
Local, vetted engineers deliver this work on site across the United States and Western Europe, coordinated by one engagement manager.
QUESTIONS
Frequently asked questions.
Why does asset register accuracy matter after IMAC work?
What data do engineers capture for each asset?
Can you update our CMDB directly?
What do you do with assets that are not in our register?
MORE DELIVERABLES
More from IMAC & Projects.
Related specializations
QUOTE
Request a quote.
Share a few details and we will come back with the next steps.
Get started
Need engineers on site? Tell us where.
Tell us the sites, the scope and the timeline. We reply with a written plan.