IMAC & Projects · Deliverable
Pre-Move and Post-Move IT Checklists.
Pre-move and post-move checklists verified by the engineer and site contact
Part of IMAC & Projects. Last reviewed October 2026.
Quick answer
What is Pre-Move and Post-Move IT Checklists?
A pre-move and post-move checklist is a signed record of what was connected before an IT relocation and what was verified working afterward. Deploris engineers complete both against the same asset list and the site contact countersigns each, so you hold evidence that every device, port, and peripheral arrived intact and functional.
WHAT THE WORK COVERS
What Pre-Move and Post-Move IT Checklists includes.
- 01Destination readiness checks before move day: power outlets, live network ports, patch panel labels, and furniture in place
- 02As-is documentation of the source desk or rack: photos, cable routing, and labels on both cable ends
- 03A per-desk asset list with serials, docks, monitors, phones, and any non-standard peripherals or adapters
- 04Handling controls: anti-static packing, extra protection for monitors, and boxes labelled by destination and owner
- 05Post-move functional tests: link and IP address, directory login, printing, softphone or desk phone, displays, and peripherals
- 06A punch list of defects and missing items, each with an owner and a target date
- 07Countersignature by the site contact with name, date, and time
HOW WE DELIVER IT
How it is delivered.
- 1
Pre-move survey
An engineer inspects the destination for power, ports, and space, compares it with the asset list, and reports any gap to your facilities or cabling team before move day.
- 2
Pre-move checklist and labelling
Every item is photographed, labelled, and ticked against the list. The site contact reviews the checklist and signs that the source state is recorded.
- 3
Move and reinstall
Equipment is disconnected, transported, and reconnected at the destination to the recorded layout, with cable labels matched to the pre-move photos.
- 4
Post-move verification
The engineer runs the post-move tests desk by desk, logs failures on the punch list, and obtains the site contact's countersignature before the move is closed.
INPUTS AND OUTPUTS
What you provide and what you receive.
You provide
- The move plan: who moves where, the date window, and any desks with fixed deadlines
- Confirmation that destination power, network ports, and furniture will be ready
- A named site contact at both source and destination who can sign
- Your post-move acceptance tests if they go beyond link, login, print, and peripherals
You receive
- A completed pre-move checklist and a completed post-move checklist for each desk or rack, both countersigned
- As-is photos taken before disconnection and as-built photos after reconnection
- A punch list of open defects with owners
- An updated asset location record for every moved device
WHEN IT FITS
When this is the right deliverable.
A department of 60 staff is changing floors over a weekend and Monday morning must start with every desk working.
A facilities manager needs written proof that the destination was ready and that nothing was damaged, so disputes with movers or landlords can be settled.
An IT lead is relocating a small server room or comms cabinet and needs the cable layout recorded precisely enough to rebuild it elsewhere.
WHERE WE DELIVER
Delivered in 75+ metros across 11 countries.
Local, vetted engineers deliver this work on site across the United States and Western Europe, coordinated by one engagement manager.
QUESTIONS
Frequently asked questions.
What should a pre-move IT checklist cover?
Why do we need a post-move checklist as well?
Who signs the checklists?
What happens if the destination is not ready on move day?
MORE DELIVERABLES
More from IMAC & Projects.
Related specializations
QUOTE
Request a quote.
Share a few details and we will come back with the next steps.
Get started
Need engineers on site? Tell us where.
Tell us the sites, the scope and the timeline. We reply with a written plan.