Structured Cabling Design and Floor Plans.

Cabling design with floor plans, cable routes, and outlet locations

Part of Structured Cabling. Last reviewed October 2026.

Quick answer

What is Structured Cabling Design and Floor Plans?

A structured cabling design is the drawing set and specification that defines where every outlet, cabinet, pathway, and cable route goes before installation starts. Deploris surveys the site, plans horizontal and backbone runs within channel length limits, and delivers floor plans, a cable schedule, and a bill of materials you approve in writing.

WHAT THE WORK COVERS

What Structured Cabling Design and Floor Plans includes.

  • 01Site survey of ceiling voids, risers, slab penetrations, and existing containment, with photos of every comms room candidate
  • 02Outlet and drop count per room or desk position, including access point, camera, and door controller locations
  • 03Floor plans marked with outlet IDs, cabinet positions, and horizontal cable routes
  • 04Horizontal run length checks against the 90 meter permanent link limit, with flags on any outlet near the limit
  • 05Backbone design for riser and campus links, including fiber type and strand count
  • 06Containment sizing for tray, basket, or conduit, including spare capacity for future cable
  • 07Bill of materials with cable category, jacket rating, patch panel, faceplate, and cabinet quantities

HOW WE DELIVER IT

How it is delivered.

  1. 1

    Survey the building

    An engineer walks the site, measures pathways, checks riser access and slab or wall penetrations, and records existing cabling, containment, and any asbestos or access restrictions you flag.

  2. 2

    Draw outlets and routes

    We mark outlet positions on your floor plans, assign outlet IDs, route each horizontal run back to its telecom room, and check each run against channel length limits.

  3. 3

    Size pathways and materials

    We size containment fill, choose cable category and jacket rating for each space type, and compile the bill of materials and a cable schedule.

  4. 4

    Review and sign off

    Your IT lead, facilities contact, and any fit-out contractor review the drawings with your engagement manager. Changes are made before approval, and the signed design becomes the written scope.

INPUTS AND OUTPUTS

What you provide and what you receive.

You provide

  • Current architectural floor plans in PDF or CAD, or access for us to measure the space
  • Headcount, desk density, and the device types that need a wired connection (phones, access points, cameras, displays)
  • Any cabling standard, manufacturer, or cable category your organization already specifies
  • Building access arrangements and contacts for landlords or other trades

You receive

  • Marked-up floor plans showing outlet IDs, cabinet positions, and cable routes
  • A cable schedule listing each run with source, destination, cable type, and estimated length
  • A bill of materials ready for procurement or price comparison
  • A written list of survey findings and assumptions that affect cost or schedule

WHEN IT FITS

When this is the right deliverable.

Scenario 01

You are fitting out a new floor and need drop counts and routes agreed with the landlord and fit-out contractor before ceilings close.

Scenario 02

You are adding Wi-Fi access points or cameras and need to know whether existing containment and comms room space can take the extra cable.

Scenario 03

You want comparable quotes from several installers and need a single design and bill of materials they can all price against.

WHERE WE DELIVER

Delivered in 75+ metros across 11 countries.

Local, vetted engineers deliver this work on site across the United States and Western Europe, coordinated by one engagement manager.

QUESTIONS

Frequently asked questions.

What should a structured cabling design include?
A usable design includes floor plans with outlet IDs, cable routes, cabinet positions, a cable schedule, containment sizing, and a bill of materials. It also lists the cable category, jacket rating, and backbone fiber type. Without these, installers will price against different assumptions and the final scope will drift.
How many network outlets do I need per desk?
Two data drops per desk is a common office baseline, one for the workstation and one spare or for a phone. Add drops for ceiling access points, cameras, displays, and badge readers. Labs, trading floors, and support desks often need four or more per position. The final count is agreed in the written scope.
What is the maximum length of a horizontal cable run?
The permanent link is limited to 90 meters of installed cable, and the full channel including patch cords is limited to 100 meters under TIA-568 and ISO 11801. A design should check each route against that limit, because routes through risers and around obstacles are longer than the straight-line distance.
Can you design cabling for a building we have not seen yet?
We can produce a preliminary design from architectural drawings, but a site visit is needed to confirm ceiling access, riser space, and penetrations. Drawings often differ from the finished building. We flag assumptions in writing and update the design after the survey, before any installation starts.

QUOTE

Request a quote.

Share a few details and we will come back with the next steps.

Get started

Need engineers on site? Tell us where.

Tell us the sites, the scope and the timeline. We reply with a written plan.

Go to

Saved and recent pages stay on this device. Press ? for keyboard shortcuts.

Keyboard shortcuts

Search the site
/ or Ctrl K
Show this list
?
Switch light, dark or system theme
t
Save or unsave this page
s
Go to the home page
g then h
Go to services
g then s
Go to coverage
g then c
Go to the contact form
g then q

Shortcuts are off while you type in a field.